Footnotes — Maintenance Schedule Additional Required Services — Severe
a) Check all fuel and vapor lines and hoses for proper hook-up, routing, and condition. Check that the purge valve, if the vehicle has one, works properly. Replace as needed.
b) Or every four years, whichever comes first.
c) Or every five years, whichever comes first. See Cooling System .
d) Or every 10 years, whichever comes first. Inspect for fraying, excessive cracking, or damage; replace, if needed.
See also:
Using the Call Command
1. Press
.
► For vehicles without a navigation system, the system responds “Ready,” followed by a tone.
► For vehicles with a navigation system, the system responds with a tone. Aft ...
Headlamp Aiming
The vehicle has a visual optical headlamp aiming
system. The aim of the headlamps have been preset at
the factory and should need no further adjustment.
However, if the vehicle is damaged in a cr ...
Automatic EPB Release
The EPB will automatically release if
the vehicle is running, placed into
gear, and an attempt is made to
drive away. Avoid rapid acceleration
when the EPB is applied, to
preserve parking br ...
